New "VBKI House"
Bleibtreustraße 48A, 10623 Berlin
Our house is taking shape
Work has started on the VBKI headquarters
The excavators have arrived, the construction crane has been erected and work on the future VBKI headquarters in Bleibtreustraße in Charlottenburg-Wilmersdorf is picking up speed. Following the official start of construction in January of this year, the work is proceeding according to plan. By spring 2027, seven floors with a usable area of 2,100 square meters will be built on the 530 square meter site. The official laying of the foundation stone will take place on July 10, 2025 - make a note of it now.
We want to use part of the space - around 700 square meters - for our association's purposes: as the headquarters of the office, a venue for events and conferences and, above all, as a place for VBKI members to get together. The other part, covering around 1,600 square meters, will be rented out.
Sustainability at the highest level
The project sets standards for ecologically responsible construction - certified, sustainable and low-emission.
DGNB Platinum
highest award from the German Sustainable Building Council
EU taxonomy-compliant:
meets the criteria for environmentally sustainable investments
Heating and cooling with a heat pump:
Electricity-based, efficient and low-emission
photovoltaic system:
Own electricity production from solar energy
CO₂-reduced concrete:
Climate-friendly construction thanks to material-optimized cement
++ Please make a note: The laying of the foundation stone will take place on July 10! ++
![IMG_1260[34]](https://vbki.de/wp-content/uploads/2025/05/IMG_126034-scaled.jpeg)

View of Bleibtreustraße | Source: Axthelm Rolvien Architekten

![IMG_1267[79]](https://vbki.de/wp-content/uploads/2025/05/IMG_126779-scaled.jpeg)

Event area ground floor VBKI | Source: Axthelm Rolvien Architekten
Facts & Figures
Owner
VBKI Immobilien GmbH
ARCHITECT
Axthelm Rolvien Architects
CLIENT REPRESENTATION
bdp real estate GmbH
GENERAL CONTRACTOR
Glass Ingenieurbau Leipzig GmbH
PLANNING TEAM
Excavation planning: GuD Geotechnik und Dynamik Consult GmbH
Structural planning: Schlaich Bergermann Partner sbp se Beratende Ingenieure im Bauwesen
Open space planning: Georg v. Gayl - Landschaftsarchitekten Planungsgesellschaft mbH
Building services: Planungsbüro Langebach GmbH / SL Elektroplanung GmbH
Building physics / DGNB: dieBauingenieure
PLANNING STATUS
Submission of building application 18.12.2020
Subsequent submission 21.07.2021
Planning permission granted on 24.04.23
(decision no. 2020 / 4007)
Submission of a modification to the
planning permission on 04.07.23
LOCATION
10623 Berlin | Charlottenburg-Wilmersdorf
USE
Office building
EG+OG1: Public areas of the VBKI, event hall and office
OG2-OG6: Office space for letting
PROJECT STATUS
Implementation planning ongoing
Excavation work started in January 2025
PLOT SIZE
530 sqm
NUMBER OF FLOORS
7
BGF
approx. 2,510 sqm
Rental space
approx. 2,100 sqm
SUSTAINABILITY
DGNB Platinum
EU taxonomy compliant
Electricity-based heating/cooling via heat pump
PV system
CO-reduced concrete
SPECIAL CHALLENGES
Property directly on the railroad (mainline and suburban train tracks)
Complex special civil engineering work
High demands on logistics due to the narrow plot of land